The critical element of any wind turbine project is obviously the wind. If you do not have the wind speeds that you first envisaged then there is very little that you can do to improve the returns from your project once you have your wind turbine installed.
At the GreenYard, we can report that the majority of sites where we have undertaken actual measurement of wind speeds have o...
Read More
The Grid Show Stopper
The aspirations of many landowners and renewable energy companies have been severely curtailed of late due to high grid connection quotations. This situation has arisen due to both our weak grid infrastructure and to the high demand for connection onto the grid in localised areas. Most of our 11kva grid network can only support a limited number of generating stations which means that where there...
Read More
Bann Valley Success
Another start to finish project.
This 150 kW Bonus was recently installed near Rasharkin, Co. Antrim.
We provided the planning, consultation, grant aid advice, grid connection application and economic appraisal of for this project.
Turbine Details
Bonus 150kW
Rotor diameter: 23.8m
Swept area: 445m2
Hub height 30m
Read More
Amongst the Sheep in Glenarm
Another GreenYard client has recently installed a wind turbine. The Broughshane farmer opted for an Endurance E3120 based on the advice and guidance received from our wind energy specialists.
Our advice on site selection, feasibility analysis and grant aid all helped to bring this project to fruition.
His success story has been added to our collection of completed projects and numbers of satis...
Read More