Home / Wind Energy News / Wind Speeds

Wind Speeds

Wind-Turbine-50kW-Endurance-E-3120-28

The critical element of any wind turbine project is obviously the wind.  If you do not have the wind speeds that you first envisaged then there is very little that you can do to improve the returns from your project once you have your wind turbine installed.

 

At the GreenYard, we can report that the majority of sites where we have undertaken actual measurement of wind speeds have overestimated wind data.  On average the variance between projected wind speeds (databases) and actual wind speed can be as much as twenty percent less.  The GreenYard undertook a one year measuring campaign using two calibrated anemometers on a 30m mast on a very good site in North Antrim.  The site was on an open hill at an elevation of 225m above sea level.  Desk top wind data indicates that the wind speeds at 30m range from 7.5m/s to 7.75 m/s.  Actual measured wind speeds benched marked against 20years of met office data resulted in a true wind speed measurement of 6.2m/s.  This project remains feasible but the returns will be much less than originally projected.  Using the power curve data from a Norwin N29, the financial variance on this site would be £48,000 per year less!

On another good quality site at a much lower elevation outside Cookstown, the estimated desk top data suggested wind speeds of 6.5 to 6.75m/s.  Actual measured wind speeds indicate an annual average of 5.28m/s.  A new turbine on this site would be a failure and incur a financial loss.

 

On the basis that the power within the wind is a cubic factor, that is if your wind speed doubles the potential power increases eight fold (and vice versa) then any project that over estimates wind speeds is likely to fail or fall short of expectations (and interest payments).

 

Our advice is simple – do not rely upon computer databases to do your homework.  Unless you have an exceptionally open site e.g. the centre of Lough Neagh, then you should measure wind speeds.

 

Contact the GreenYard at 028 79300606 if you wish to re-examine the feasibility of your renewable energy project.

 

 

 